FEASIBILITY STUDY
OF
Edisons, 42 King Street, Leigh, Cheshire
FOR
Mr A Client
Prepared by:
GEM Associates Limited
INDEPENDENT CHARTERED SURVEYORS
FOR ANY HELP OR ASSISTANCE CALL FREE PHONE:
0800 298 5424
or
visit our website:
www.1stAssociated.co.uk
CONTENTS INTRODUCTION
REPORT FORMAT
SYNOPSIS
EXECUTIVE SUMMARY
SUMMARY UPON REFLECTION
EXTERNAL
CHIMNEY STACKS AND PARAPET WALLS
ROOF COVERINGS AND UNDERLAYERS
GUTTERS AND DOWNPIPES AND SOIL AND VENT PIPES
WALLS
EXTERNAL JOINERY AND BRICK DETAILING
EXTERNAL DECORATIONS
INTERNAL
CEILINGS, WALLS, PARTITIONS AND FINISHES
FLOORS
DAMPNESS
INTERNAL JOINERY
TIMBER DEFECTS
INTERNAL DECORATIONS
CELLARS
THERMAL EFFICIENCY
OTHER MATTERS
SERVICES
ELECTRICITY
GAS
PLUMBING AND HEATING
MAIN DRAINS
OUTSIDE AREAS
PARKING
POINTS FOR LEGAL ADVISOR
APPENDICES
LIMITATIONS
INTRODUCTION
Firstly, may we thank you for your instructions of
?????????; we have now undertaken a Feasibility Study of the aforementioned
property. This Feasibility Study was carried out on ????????????.
The Feasibility Study takes the following format; there
is an introductory section (which you are currently reading), which
includes a synopsis of the building, and a summary of our findings.
We then go through a detailed examination of the property
starting with the external areas working from the top of the property
down, followed by the internal areas and the buildings services. We
conclude with the section for your Legal Advisor and also attach some
general information on the property market.
We are aware that a report of this size is somewhat
daunting and almost off-putting to the reader because of this. We would
stress that the purchase of a business has many risks, the property
being one of the biggest. Often when a business is purchased our clients
can only see the opportunities that it offers, the aim of this report
is to give a balanced view on the future risk.
We recommend that you set aside time to read the report
in full, consider the comments, make notes of any areas which you wish
to discuss further and phone our us.
We obviously expect you to read the entire report but
we would suggest that you initially look at the summary, which refers
to various sections in the report which we recommend you read first
so that you get a general feel for the way the report is written.
As part of our service we are more than happy to talk
through the Feasibility Study as many times as you wish until you are
completely happy to make a decision. Ultimately, the decision to purchase
the property is yours but we will do our best to offer advice to make
the decision as easy as possible.
REPORT FORMAT
To help you understand our Report we utilise various
techniques and different styles and types of text, these are as follows:-
GENERAL/HISTORICAL INFORMATION
This has been given in the survey where it is considered
it will aid understanding of the issues, or be of interest. This is
shown in “italics” for clarity.
TECHNICAL TERMS DEFINED
Throughout the Report, we have endeavoured to define
any technical terms used. This is shown in “Courier New”
type face for clarity.
PHOTOGRAPHS
ORIENTATION
Any reference to left or right is taken from the front
of the property, including observations to the rear which you may not
be able to physically see from the front of the property.
ACTION REQUIRED AND RECOMMENDATIONS
We have used the term ACTION REQUIRED where we believe
that there are items that you should carry out action upon or negotiate
upon prior to purchasing the property.
Where a problem is identified, we will do our best
to offer a solution. However, with most building issues, there are usually
many ways to resolve them dependent upon cost, time available and the
length of time you wish the repair/replacement to last.
SYNOPSIS
SITUATION AND DESCRIPTION
This is a very large public house, four storeys in
height with a cellar, rear courtyard area and parking space for a few
cars.
The trading area is located on the ground floor level
with toilets, offices and private living accommodation located on the
first floor level. The cellars are located in the basement area.
At the time of our inspection the property was undergoing
a refurbishment of these areas, we are advised with costs in the region
of £150,000.
The public house is presently closed for trading. Our
understanding of the situation is that future trade is anticipated to
be wet trade driven together with AWPs, with a split of the income being
set out within your lease. Future dry (food) trade will be at the discretion
of the leaseholder with 100% profits. Therefore there is no refurbishment
of the kitchen presently being carried out.
EXTERNAL PHOTOGRAPHS
Front Elevation
Side Elevation
This is a very large property, which you will be responsible for under
the terms of most typical Leases. The costs could be considerable.
ACCOMMODATION AND FACILITIES
Ground Floor - Trading Area
Front of House
- A large open plan bar currently under construction,
at the time of our inspection
- Disabled toilets (locked at the time of our inspection)
- Access area
Back of House
- Catering kitchen (locked at the time of our inspection)
Cellar - Access from the Stairway
- Cold Store
- Bottle Store
- Plant Room Area
First Floor
Front of House
- Work was underway to provide new toilets for customers
Back of House
- Office
- Existing staff toilets
Private Living Accommodation
- Lounges
- Bathroom
- Bedrooms
Outside Areas
We would refer you to our earlier comments and we would
add that this corner property sits directly onto the pavement. To the
rear there is a courtyard area as well as the manager's car parking
Conservation Area/Listed
It has not been confirmed whether the property is Listed
or within a Conservation Area. We would always recommend that general
advice on these matters be obtained from the Local Authority
INTERNAL PHOTOGRAPHS
As things tend to move fairly fast with refurbishment
projects we have put some photos in to remind you of the condition it
was in when we viewed the trading area.
|
|
The new bar taking shape
|
The rear raised floor area being
constructed
|
SUMMARY OF CONSTRUCTION
EXTERNAL
Chimneys: |
Large brick chimneys |
Main Roof: |
A pitched slate roof with surrounding parapet walls |
Rear Roofs: |
Flat Roofs |
Gutters and
Downpipes:
|
Predominantly cast iron, but some plastic |
Walls: |
Brick finished in a stretcher bond construction |
External Joinery: |
Painted timber sliding sash windows |
INTERNAL
Ceilings: |
Original lath and plaster with
some plasterboard replacement (assumed) |
Walls: |
A mixture of studwork and solid (assumed) |
Floors: |
Ground Floor: A mixture of a joist
and floorboard construction and, we believe, a reinforced concrete
floor (assumed) |
|
First – Third Floor: Joist
and Floorboard construction with herringbone strutting |
SERVICES
We were advised by yourself that the property has a
mains water supply, drains, electricity and gas.
The above terms are explained in full in the main body of the Report.
We have used the term ‘assumed’ as we have not opened up
the structure.
EXECUTIVE SUMMARY
Summaries are dangerous as they try to précis
often quite complex subjects into a few paragraphs. This is particularly
so in a summary about someone’s future business and possibly home
when we are trying to second-guess what the priorities are, so it is
important the Report is read in full. Having said all of that, here
are our comments:-
Overall Opinion
Generally we found the property to be in below average
condition for a public house, based upon what we typically see; even
bearing in mind that the public house has been shut for some time and
generally we find public houses to be below the typical commercial standard.
The main issues relate to the repair and renewal of such a large structure.
There are major defects, some of them original design defects, and despite
repairs to the structure having been carried out, they are far from
complete.
We have divided this Feasibility Study into ‘The Good’,
‘The Bad’ and ‘The Ugly’, for ease of reading
and to help distinguish what in our mind are the main issues.
The Ugly
1) |
Limit your Liabilities |
|
We recommend only leasing the trading areas
and the private living accommodation associated with it. As
discussed, basically this translates into leasing the cellar,
the ground floor and the first floor only with no responsibility
whatsoever for any parts of the building above, internally or
externally.
From our discussions after the survey we believe that the property
owner is willing to negotiate on this matter.
ACTION REQUIRED: Your Legal
Advisor to prepare or check documentation prepared by the Landlord
to ensure the above.
In our experience a problem that can occur is
defects in the structure that you are not responsible for not
being repaired and which eventually affect your business, for
example the leaving of a roof leak.
We therefore believe that you should have written in to the legal
agreement that the property will be inspected every six months
by an Independent Chartered Surveyor (i.e. not one that they employ)
and any work that they identify on a non-emergency basis to be
carried out within one week and on an emergency basis to be carried
out within 24 hours.
ANTICIPATED COST: All costs
to be borne by the Landlord.
|
2) |
Dry Rot and Wet Rot |
|
Due to the way the roof
was originally designed with the parapet wall and pitched
roof forming a gutter detail, dampness will occur within
the roof joists. This has previously been left unrepaired
and has caused extensive wet rot and dry rot. |
|
Whilst we could see that some repairs have been carried out more
recently they tend to be only to the common rafters and not to
the main pre-fabricated trussed rafters where we could see wet
rot and dry rot.
Dry rot is a major problem. The problem is that it can spread
throughout a building. We could see examples of what is known
as the ‘fruiting body’ within the roof structure and
this means that there is a chance it has been passed throughout
the building.
ACTION REQUIRED: Any dry rot
occurring within the property should not form part of your responsibilities
under the terms of your Lease.
|
3) |
External Redecoration and
Associated Repairs |
|
If agreement can
be reached, as stated in item one and two, which from our discussions
on Saturday ????????? and Monday ?????? it would appear that the
Landlord is prepared to agree to, agreement has to be made with
regard to how the upper floors of the building will be maintained.
We therefore believe that there need to be specific agreed years
for external redecoration, i.e. the summer of 2005 and then future
years, i.e. the summer of 2008, a three year redecoration cycle
would be recommended. For example a major cost involved with this
property is the redecoration, as scaffolding will be required
to the external of the property.
The first two floors that look likely to form part of your Lease
can be accessed from long ladders or tower scaffolding; however
to carry out redecoration and associated repairs, and non associated
repairs (such as repairs to the brickwork and parapet walls and
enhancement, such as signage and lighting) will all need scaffold.
Not only does the cost of the scaffold need to be considered it
also needs to be considered as to when the scaffolding goes up
as this can ruin the external appearance of a property and make
it look as if it is closed.
This is a general view
of the sliding sash windows. Some are broken and cracked.
These need replacing. |
|
Redecoration required to the external joinery. |
|
ACTION REQUIRED: Your Legal
Advisor to ensure that specific clauses are within your part
of the Lease that state when the external redecoration will
be required by date.
ANTICIPATED COSTS: In future years you will
have the cost of the external redecoration on your section
of the Lease, however, we believe you should negotiate at
present that it is all redecorated externally at the present
owners cost.
This can be in the tens of thousands with the scaffolding.
The opportunity should be taken when the scaffolding is up
to sort out signage and lighting too and any other repairs
necessary to the gutters and downpipes etc. We believe all
of this should be at the present owners cost.
|
4) |
Rear Valley Gutter |
|
There is a very awkward
valley gutter detail to the rear of the property. We believe
this is leaking and from what we can see it is mainly the
responsibility of the adjoining owner; however, it will
be causing dampness into your property. |
|
ACTION REQUIRED: The present
owner should negotiate with the adjoining property owner and
have the valley gutter renewed prior to the signing of the
lease.
|
The Bad
|
5) |
Schedule of Condition |
|
From our understanding
all other items can be carried out under a Schedule of Condition,
which we can return to carry out when the works are nearing completion.
The Schedule of Condition is far better carried out with a refurbishment
nearing completion, preferably complete, as this then has the
benefit of us being able to see the standard of workmanship that
has been carried out and also basic things such as having lights
on in each room, rather than having to work with torchlight as
we did during the course of this Feasibility Study.
ACTION REQUIRED: Your Legal
Advisor to confirm that your full liability with regard to the
overall condition of the property will be limited by a Schedule
of Condition.
We would reiterate our initial comments that this is a very
large property with significant future repair liabilities that
you do not wish to take on board at all, particularly when you
will only be using the lower floors of it.
|
6) |
Chimneys |
|
From the ground level and
via our inspection with digital binoculars / camera we could
see that some of the chimneys are leaning. In particular
the chimneys in this photo appear to be leaning. |
|
This photo is a close up and shows them
to be in a reasonable condition, however we do feel they need
further specific inspection. |
|
ACTION REQUIRED: The chimneys
should be inspected.
|
7) |
Floors |
|
We noted during the course of
our inspection that some of the floors have been opened up. However,
as there was no light in the rooms and the windows had been blackened
out in most cases (apart from where they are broken) we had to
view these areas under torchlight.
ACTION REQUIRED: We would
like to specifically request that these areas are not closed
up until after we have inspected them with electric lights on
in the rooms.
|
8) |
Gutters and Downpipes |
|
The majority of the gutters
and downpipes are cast iron and the majority of them are
rusting and/or leaking. This can in turn affect your part
of the property.
In this photo you can see a downpipe discharging onto the
wall. |
|
Here is another downpipe discharging onto the wall. |
|
The gutter shown below on the left is leaking.
The right hand photo is a close up.
ACTION REQUIRED: Landlord
to confirm what work he intends to carry out regarding the gutters
and downpipes.
|
9) |
Cellar Area |
|
We do not believe that the present
cellar is up to Environmental Health standards and is therefore
not suitable to serve beer from.
ACTION REQUIRED: The present
owners to bring the cellar up to Environmental Health standards
(EHO).
|
10) |
Services |
|
During our discussions you advised
that all services would be ‘as new’. Nevertheless,
we would still request a close circuit TV camera inspection of
the drainage.
Clarification is also required as to what the intension will be
for the upper floors as they will need some background heat and
also a fire alarm system throughout. We would recommend that access
is restricted to the area, so as to avoid the temptation to use
it for storage space, although we believe that access will be
required as a means of a fire escape.
Drainage
Just to emphasise, we have experienced in the
past particular problems with drainage to properties, although
it initially appears to be working it is soon found to have problems.
We therefore recommend a close circuit TV camera report be carried
out on the drainage.
ACTION REQUIRED: We recommend
a CCTV camera report be carried out.
ANTICIPATED COSTS: Costs to be borne by the
Landlord.
|
Drainage
The property has potential!
We are sure you can think of lots of other things to add to this list!
Purchase Price
We have not been asked to comment upon the purchase
price in this instance, we have not seen trading accounts, internal
records or a copy of the lease.
Every Business Transaction has a Risk
Every business transaction has a risk, only you can
assess whether that risk is acceptable to you and your circumstances.
You should now read the main body of the Report paying particular attention
to any "ACTION REQUIRED" points.
SUMMARY UPON REFLECTION
The Summary Upon Reflection is a second summary so to speak, which is
carried out with our thoughts a few days after the initial survey. We
would add the following:-
Presently, from what we could see, as things stand, there are considerable
risks and liabilities with regard to this property. Details of which
need to be fully set out and agreed by your solicitor. The items above,
we feel, are the first step towards this.
We would ask that you read the Report and contact us on any issues that
you require further clarification on.
MORE ABOUT THE REPORT FORMAT
TENURE
We have assumed that the property is on a Lease and
that there are no unusual or onerous clauses. Your Legal Advisor should
confirm this specifically to us if he thinks otherwise.
PUB COMPANY – FRIEND OR FOE?
It is important to remember that the pub company is
affectively selling the Lease and any responsibilities and liabilities
associated with it. We as your employed Independent Chartered Surveyor
represent your interests only.
TERMS OF ENGAGEMENT/LIMITATIONS
This report is being carried out under our terms of
engagement for Commercial Building Surveys, as agreed to and signed
by yourselves. If you have not seen and signed a copy of our terms of
engagement please phone immediately.
OUR AIM IS ONE HUNDRED PERCENT SATISFACTION
Our aim is for you to be completely happy with the
service we provide, and we will try and help you in whatever way possible
with your business purchase. If you require any further information
please telephone us.
THE FOLLOWING SECTION OFFERS
A BRIEF PHOTOGRAPHIG RECORD OF THE PROPERTY
EXTERNAL
CHIMNEY STACKS AND PARAPET WALLS
|
|
Chimneys and Parapet Walls
Chimneys developed originally from open fires placed
within buildings. From this, the chimney has developed to its present
day format where it is used as an aesthetic feature and focal point
rather than purely just to heat the room.
Parapet walls are usually walls that are above roof level and often
sit on the boundary of the property.
The property has large chimneys
and parapet walls, some of which are braced.
Please see our comments in the Executive Summary with regard to
the leaning chimneys and the dampness getting into the property.
|
|
Finally, we have made our best assumptions on the overall
condition of the chimney stacks and parapet walls from the parts we
could see. The inspection was made from ground level within the boundaries
of the property (unless otherwise stated) using a x16 zoom lens on a
digital camera. A closer inspection may reveal latent defects.
ROOF COVERINGS AND UNDERLAYERS
|
|
The Roof Coverings and Underlayers section considers
the condition of the outer covering of the roof. Such coverings usually
endure the extremes of climate and temperatures. They are susceptible
to deterioration, which ultimately leads to water penetration.
The underlayer’s function is to minimise wind and water damage.
Dependent upon the age of your property this may or may not be present,
please read on:
This photo shows a close up of
the rear roof. There are some slipped tiles and the roof is starting
to deteriorate. |
|
There is a flat roof to the rear, which was difficult
to view as many areas were iced over at the time of our inspection.
These areas have water on, which is known as ‘ponding’
and can be the areas where leaks occur. |
|
Finally, all the roofs were inspected from ground level
with the aid of a x16 zoom lens on a digital camera. Flat roofs have
been inspected from upper floor windows and/or ground level.
For further comments with regard to ventilation please see the Roof
Structure and Loft Section.
ROOF STRUCTURE AND LOFT
(ALSO KNOWN AS ROOF SPACE OR ATTIC SPACE)
|
|
The roof structure or framework must be built in
a manner which is able to give adequate strength to carry its own weight
together with that of the roof covering discussed in the previous section
and any superimposed loads such as snow, wind, foot traffic etc.
Please see our comments in the Executive Summary of
this Report.
This photo shows a general view
of the roof space. |
|
A view of some areas where the timbers have been
replaced. |
|
Finally, we would ask you to note that this is a general
inspection of the roof, i.e. we have not examined every single piece
of timber. We have offered a general overview of the condition and structural
integrity of the area.
The function of the gutters and downpipes is to
carry rainwater from the roof to the ground keeping the main structure
as dry as possible.
Defective gutters and downpipes are a common cause of dampness that
can, in turn, lead to the development of rot in timbers. Regular inspection
and adequate maintenance are therefore essential if serious problems
are to be avoided.
Please see our comments in the Executive Summary.
In this photo you can literally
see vegetation hanging out of the guttering. |
|
Finally, gutters and downpipes have been inspected
from ground level. As it was not raining at the time of the inspection
it is not possible to confirm 100 per cent that the rainwater installation
is free from blockage, leakage etc. or that it is capable of coping
with long periods of heavy rainfall. Our comments have therefore been
based on our best assumptions.
External walls need to perform a variety of functions.
These include supporting upper floors and the roof structure, resisting
dampness, providing adequate thermal and sound insulation, offering
resistance to fire and being aesthetically presentable.
This photo shows a general view
of the wall. You can see that some of the stone detailing is starting
to deteriorate. This is the sort of thing that needs to be picked
up in a Schedule of Condition to ensure that you do not have to
make this good when you come to vacate the property. |
|
Finally, the external walls have been inspected visually
from ground level and/or randomly via a ladder. Where the window and
door lintels are concealed by brickwork and plasterwork we cannot comment
on their construction or condition. In buildings of this age rubbed
brick lintels or metal lintels are common, which can be susceptible
to deterioration that is unseen, particularly if in contact with dampness.
Our comments have been based upon how the brickwork and plasterwork
has been finished. We have made various assumptions based upon what
we could see and how we think the brickwork and plasterwork would be
if it were opened up for this age, style and type of construction. We
are however aware that all is not always at it seems in the building
industry and often short cuts are taken. Without opening up the structure
we have no way of establishing this.
The foundations function is, if suitably designed
and constructed, to transfer the weight of the property through the
soil. As a general comment, many properties prior to the 19th Century
have little or no foundations, as we think of them today, and typically
a two-storey property would have one metre deep foundations.
We have not inspected the foundations and can only
comment that there was no major cracking, as far as we are aware, to
the walls to the base of the property, which would indicate structural
movement.
Finally, we have not excavated the foundations but
we have drawn conclusions from our inspection and our general knowledge
of this type, age and style of property.
As no excavation has been carried out we cannot be 100 percent certain
as to how the foundation has been constructed and we can only offer
our best assumptions and an educated guess, which we have duly done.
The external joinery part of this section covers
fascias, soffits and bargeboards, windows and doors, and any detailing
such as brick corbelling etc.
Fascias and soffits offer protection to the rafter feet and also allow
the securing of the guttering. Windows primary functions are to admit
light and air, but they also have thermal and sound properties. The
doors allow access and egress within the property.
Please see our comments in the Executive Summary.
Finally, we have carried out a general and random inspection
of the external joinery. In the case of the fascias and soffits it is
typically a visual inspection from ground level. With the windows and
doors we have usually opened a random selection of these during the
course of the survey. In this section we are aiming to give a general
overview of the condition of the external joinery. Please also see the
Internal Joinery section.
The external decorations act as a protective coat
for the building from the elements. Where this protective covering has
failed, such as with flaking paintwork, the elements will infiltrate
the structure. This is of particular concern as water is one of the
major factors in damage to any structure.
Please see our comments in the Executive Summary.
Finally, ideally external redecoration is recommended
every four to five years dependent upon the original age of the paint,
its exposure to the elements and the materials properties. Where painting
takes place outside this maintenance cycle repairs should be expected.
Ideally redecoration should be carried out during the better weather
between mid-April and mid-September.
Please see our comments in the External Joinery section.
INTERNAL
CELINGS, WALLS, PARTITIONS AND FINISHES
|
|
The ceiling was deteriorating/removed
in many areas. |
|
Lath and Plaster Defined Laths are thin
strips of timbers which are fixed to the structure. Wet plaster
is applied to the laths, usually in several layers. The plaster
forms a key as it is forced between the laths. This plaster, once
dry, is given further coats and often a decorative finish.
|
|
There is some movement between the internal walls and
the external wall within the office area at first floor level. This
needs to be recorded in the Schedule of Condition.
Finally, ceilings, walls and partitions have been inspected
from floor level and no opening up has been undertaken (unless permission
has been obtained by yourselves). In some cases the materials employed
cannot be ascertained without samples being taken and damage being caused.
We cannot comment upon the condition of the structure hidden behind
plaster, dry lining, other applied finishes, heavy furniture, fittings
and kitchen units with fitted back panels.
Functionally floors should be capable of withstanding
appropriate loading, preventing dampness, have thermal properties and
durability. In addition to this upper floors should offer support for
ceilings, resistance to fire and resistance to sound transfer.
Please see our comments within the Executive Summary.
You do need to closely inspect these floors.
Joist and Floorboard
Construction Defined
These are usually at first floor level consisting of a joist
supported from the external walls, either built in or, in more
modern times, sitting upon joist hangers, sometimes taking additional
support from internal walls, with floorboards fixed down upon
it.
|
|
Finally, we have not been able to view the actual floors
themselves due to there being no natural light in many of the rooms.
The comments we have made are based upon our experience and knowledge
of this type of construction. We would emphasise that we have not opened
up the floors in any way or lifted any floorboards.
In this section we look at any problems that are
being caused by dampness. It is therefore essential to diagnose the
source of the dampness and to treat the actual cause and not the effect
of the dampness.
Rising Damp and Lateral or Penetrating Dampness
As one would expect in a property in this condition
there is both rising damp and lateral dampness. We need to re-inspect
with regard to rising damp.
Finally, effective testing was prevented in areas concealed
by heavy furniture, fixtures such as kitchen fittings with backboards,
wall tiles and wall panelling. We have not carried out tests to BRE
Digest 245, but only carried out a visual inspection.
This section looks at the doors, the stairway,
the skirting boards and the kitchen to give a general overview of the
internal joinery’s condition.
A refurbishment is presently being carried out to the
ground floor and the first floor. The upper floors are in a state of
dilapidation.
Finally, it should be noted that not all joinery has
been inspected. We have viewed a random sample and visually inspected
these to give a general over-view of the condition. Please also see
the External Joinery/Detailing section.
This section considers dry rot, wet rot and woodworm.
Wet and Dry rot are species of fungi, both need moisture to develop
and both can be very expensive to correct. We would also add that in
our experience they are also often wrongly diagnosed.
Dry Rot
Dry rot is also sometimes known by its Latin name
Serpula lacrymans. Dry rot requires constant dampness together with
a warmish atmosphere and can lead to extensive decay in timber.
Please see our comments in the Executive Summary.
Wet Rot
Wet rot, also known by its Latin name Contiophora
puteana, is far more common than dry rot. Wet rot darkens and softens
the wood and is most commonly seen in window and doorframes, where it
can relatively easily be remedied. Where wet rot affects the structural
timbers in a property, which are those in the roof and the floor areas,
it is more serious.
Please see our comments in the Executive Summary.
Woodworm
Active woodworm can cause significant damage to
timber. There are a variety of woodworm that cause different levels
of damage with probably the worst of the most well known being the Death
Watch Beetle. Many older properties have woodworm that is no longer
active, this can often be considered as part of the overall character
of the property. Recent research has shown that many woodworm chemicals
do not actually work and it should be remembered that the chemicals
are poisons. Also, unless great care is taken, the people applying the
treatment can cause significant damage. The woodworm can only really
be seen in action during the breading season, which runs from April
to July. We have therefore tried to take a pragmatic view on this matter.
We need to re-inspect for woodworm.
Finally, we would comment that any work carried out
should have an insurance backed guarantee to ensure that if the company
does not exist, or for whatever reason, the guarantee is still valid.
More importantly it is essential to ensure that any work carried out
is carried out correctly.
With paints it should be remembered that up to
1992 lead could be used within paint and prior to this most textured
paints (commonly known as Artex) contained an element of asbestos up
to 1984, so care should be taken if the paintwork looks old and dated.
The ground floor and first floor are currently being
refurbished. The upper floors are in a state of dilapidation. Please
see our comments with regard to the cellar area.
Finally, we would draw your attention to the fact that
removal of existing decorative finishes may cause damage to the underlying
plasterwork necessitating repairs and making good prior to redecoration.
Cellars and vaults tend to be found in older properties
and offer a useful space, particularly in a public house!. Although
usually they are damp, unless some treatment has taken place such as
the tanking of the walls, which is a liming process, or an external
damp proofing membrane of some type has been added, or if internally
the walls have been lined, therefore hiding the damp. Cellars are often
susceptible to flooding from excessive rain, rising water table levels
or even blocked drains.
Please see our comments in the Executive Summary.
Finally, we have made a visual inspection of the cellar/vault
only and have no way of knowing what the construction is without opening
up the structure.
Up until the mid 1940s we did not really consider
insulation in properties, for example it was only in the 1960s that
we started putting insulation in the roof and then it was about 50mm,
in the 1970s this was upgraded to 100mm. Then we started to think about
double glazing and cavity wall insulation. Since then insulation standards
have increased considerably and today we are looking at typically using
insulation not only in the roof but also in the walls, floors and windows
and more recently considerable work has been carried out on how efficient
boilers are within properties. Care has to be taken that properties
are not insulted disproportionately to the ventilation as this can cause
condensation and you should be aware that you need to ventilate any
property that is insulated.
You will be responsible for the heating, cooling and
lighting bills etc, which could be considerable in a property of this
size. Therefore it is important that as much insulation as possible
is added into the structure.
Roof
Presently there is no insulation. Insulation should
be added, but the roof has to be watertight first and then vented, otherwise
dry rot and wet rot will be promoted.
Windows
The windows are single glazed throughout and therefore
will not be particularly thermal efficient.
Walls
These are solid and difficult to insulate easily.
Further information can be obtained with regard to energy saving via
the Internet on the following pages:
HTTP//www.est.org.uk, which is by the Energy
Saving Trust and includes a section on grant aid
or alternatively www.cat.org.uk
or www.ecocentre.org.uk for an alternative technological view.
Finally, we would advise that an energy rating is likely
to be required for future house sales.
In this section we put any other matters that do
not fit under our usual headings.
Please see our comments in the Executive Summary.
SERVICES
This survey does not include any specialist reports
on the electricity supply and circuits, heating or drainage, as they
were not requested. The comments that follow are based upon a visual
inspection carried out as part of the overall Building Survey.
Services and specialist installations have been visually inspected.
It is impossible to examine every detail of these installations without
partially dismantling the structure. Tests have not been applied. Conclusive
tests can only be undertaken by suitably qualified contractors. The
vendor/seller should be requested to provide copies of any service records,
test certificates and, ideally, the names and addresses of the installing
contractors.
Please see our comments in the Executive Summary.
It is strange to think that electricity only started
to be used in domestic properties at the turn of the last century with
gas lighting still being the norm for a good many years after.
You should be offered an NICEIC test and certificate
on the entire property.
New Building Regulations recommend that as from 1st January 2005 certain
electrical work is required to be carried out and certified by an approved
contractor and is notifiable to the relevant local authority. Your Legal
Advisor should request any relevant documentation.
There is very little we can check for in a gas
installation, we do inspect to make sure there is one and that it has
a consumer unit and that the boilers are vented. Ideally you should
have a service inspection carried out by an independent CORGI registered
plumber.
You should be offered a certificate with regard to
the gas of the entire property.
In this section we do our best from a visual inspection
to look at how the water is supplied to the property, how the supply
is distributed around the property, how it is used to heat the property
and how it is discharged from the property.
We have not inspected the plumbing and heating as it
was not in working order at the time of our inspection and being refurbished/replaced.
Finally, it should be noted that the supply pipe from the Water Company
stopcock to the internal stop tap is the responsibility of the property
owner.
We cannot comment on the condition of the water service pipe to the
building. It should be appreciated that leaks can occur for some time
before signs are apparent on the surface.
The sanitary system, as we know it now, came into
being some 100 years ago during the Victorian era and works so successfully
today it is often taken for granted. It is only in recent years that
re-investment has taken place to upgrade the original drainage systems.
Inspection Chambers / Manholes
For your information, inspection chambers / manholes
are required to be provided in the current Building Regulations at each
change of direction or where drainage runs join the main run.
Please see our comments in the Executive Summary.
Finally, it must be emphasised that the condition of the property’s
foul drains can only be ascertained by the carrying out of a test; such
a test has not been undertaken. Should there be leaks in the vicinity
of the building then problems could occur, particularly with respect
to the stability of the building’s foundations. Drainage repairs
are inevitably costly and may result in damage being caused to those
areas of the property beneath, or adjacent to, which the drains have
been run.
Rainwater/Surface Water Drainage
Whilst very innocent looking rainwater downpipes
can cause lots of problems. If they discharge directly onto the ground
they can affect the foundations and even if they are taken away to soak-aways
they can attract nearby tree roots or again affect foundations.
Some rainwater drains are taken into the main drainage system, which
is now illegal (as we simply do not have the capacity to cope with it),
and can cause blockages to the main drains! Here we have done our best
from a visual inspection to advise of any particular problems.
Please see our comments in the Executive Summary.
Finally, rain/surface water drains have not been tested and their condition
or effectiveness is not known. Similarly, the adequacy of soak-aways
has not been established although you are advised that they tend to
silt up and become less effective with time.
Please also see our comments within the Gutters and Downpipes Section.
OUTSIDE AREAS
There is very limited parking to this property.
Finally, whilst we note the boundaries, these may not be the legal boundaries.
Your Legal Advisor should make further enquiries on this point and advise
you of your potential liability with regard to any shared structures,
boundary walls and fences.
POINTS FOR YOUR LEGAL ADVISOR
Please refer to the Executive Summary. We would recommend
that your Legal Advisor contacts us directly and we are more than happy
for you to offer them our office and mobile phone number.
LOCAL AUTHORITY ENQUIRIES
When you booked this survey we asked you if you required
us to carry out a verbal check on the status of the property with the
Local Authority regarding whether it is a Listed Building, in a Conservation
area and any history that is available over the phone with regard to
Planning Applications and Building Control. In this instance you have
not requested that we carry out this work.
Finally, your Solicitor should carry out Local Authority enquiries and
any additional enquiries he/she feels necessary, advising us if they
feel that we can have further input.
It is our policy not to offer a conclusion to ensure that the Building
Survey is read in full and the comments are taken in context.
If you would like any further advice on any of the issues discussed
(or indeed any that have not been discussed!) then please do not hesitate
to contact us on 0800 298 5424.
For and on Behalf of
GEM Associates Ltd
Chartered Surveyors
This Report is dated: ?????????
REFERENCES
The repair and maintenance of houses
Published by Estates Gazette Limited
Life expectancies of building components
Published by Royal Institution of Chartered Surveyors and
Building Research Establishment
Surveying buildings
By Malcolm Hollis 4th edition published by Royal Institution of
Chartered Surveyors Books.
House Builders Bible
By mark Brinkley, Published by Burlington Press
APPENDICES
LIMITATIONS
Our limitations are as the agreed Terms and Conditions
of Engagement.
CONDITIONS OF ENGAGEMENT
The report has been prepared in accordance with our
Conditions of Engagement dated ????????? and should be regarded as a
comment on the overall condition of the property and the quality of
its structure and not as an inventory of every single defect. It relates
to those parts of the property that were reasonably and safely accessible
at the time of the inspection, but you should be aware that defects
can subsequently develop particularly if you do not follow the recommendations.
ENGLISH LAW
We would remind you that this report should not be
published or reproduced in any way without the surveyor’s expressed
permission and is governed by English Law and any dispute arising there
from shall be adjudicated upon only by the English Courts.
SOLE USE
This report is for the sole use of the named Client
and is confidential to the Client and his professional advisors. Any
other persons rely on the Report at their own risk.
ONLY HUMAN!
Although we are pointing out the obvious, our Surveyors
obviously can’t see through walls, floors, heavy furniture, fixed
kitchen units etc. they have therefore made their best assumptions in
these areas.
As this is a one off inspection, we cannot guarantee that there are
no other defects than those mentioned in the report and also that defects
can subsequently develop.
WEATHER
It was a cold winter’s day at the time of the
inspection. The weather did not hamper the survey.
We would add that some defects only become apparent upon physical occupation
or are only present as a result of the extremes of weather (which are
becoming a more frequent occurrence). As you are probably aware the
year 2000 was the wettest year on record, 2003 the driest year on record
and August 2004 was the wettest August on record in many areas, this
may have adverse effects on lots of buildings in years to come.
NOT LOCAL
It should be noted that we are not local surveyors
to this area and are carrying out the work without the benefits of local
knowledge on such things as soil conditions, aeroplane flight paths,
and common defects in materials used in the area etc.
EMPTY PROPERTY
The property was empty at the time of our survey, we
were therefore not able to carry out our usual question and answer session
or have our questionnaire filled out.
INSPECTION LIMITED
Unfortunately in this instance our inspection has been
very limited due to the conditions that it was carried out under, i.e.
building site conditions.
|